Table 1. Reportable Pipeline Occurrences, June 2025

 

June

Year to Date (June)

2025

2024

2020-2024
average

2025

2024

2020-2024
average

Total number of occurrences447283033
Total number of occurrences with product release21112510
Total number of serious injuries000000
Total number of fatalities000000
Accidents000011
Product released000011
Release of hydrocarbon gas000010
Release of HVP hydrocarbons1000000
Release of LVP hydrocarbons2, 3000000
Release of other product000000
Release from line pipe body000011
Fire/Ignition000010
Explosion000010
Rupture000011
Pipeline contacted by object000000
Operation beyond design limits000000
Geotechnical/Hydrotechnical/Environmental activity000000
Incidents447282933
Product released2111249
Release of hydrocarbon gas1111136
Release of HVP hydrocarbons1000000
Release of LVP hydrocarbons2, 3100112
Release of other product000001
Release from line pipe body010112
Fire/Ignition011433
Explosion000121
Pipeline contacted by object301866
Operation beyond design limits010283
Geotechnical/Hydrotechnical/Environmental activity012277
Unauthorized 3rd-party activity affects pipeline structural integrity001113

Data extracted 16 July 2025

1 HVP means high vapour pressure as defined in Canadian Standards Association Standard Z662.
2 LVP means low vapour pressure as defined in Canadian Standards Association Standard Z662.
3 As of July 2014, the minimum reporting threshold for releases of low vapour pressure hydrocarbons was established at 1.5m3.